Underground
Before the slab or basement floor is poured: the building drain, under-floor waste lines and the water service entry, laid to grade and tested.
Ready for underground inspection
- Building drain and under-slab waste
- Water service entry
- Sleeves and stub-ups for later stages
- Test before the pour
